Design and management of works for the plant adaptation works necessary for the preparation of a new equipment room called Room ELA-0 and Room ELA-1 to be built on the ground floor of the Telecom building located in Via Macchia Palocco – Acilia (RM).
The activity concerns the realization of a cooling system by means of the installation of “CDZ” environments of the chilled water type with bottom outlet, dedicated exclusively to the cooling of the room equipment.
The new ELA-0 room will be equipped with an automatic Aerosol fire extinguishing system connected to the fire detection system.

Location: Acilia Rome
Client: Telecom Italia Sparkle
Year: 2014

LATEST ARTICLES

LA SIA HEADQUARTERS CONTACTS

Viale Luigi Schiavonetti 286, Roma

+39 06 4544 1972

Company Presentation

Download

INTEGRATED POLICY

Read