The new Fiumicino airport extension project, includes all the architectural, structural and plant engineering in all its mechanical and electrical components. The area of interest for this project is approximately 132,000 square meters. Specifically, the process of planning and managing BIM models was developed in collaboration with other operators, adopting state-of-the-art information management facilities.
In the construction process, La SIA was involved for the modeling activities of all the systems serving the entire facility, in the design and construction phase, up to the development of the models to LOD 500 (as-built), dividing the work into a series of models referred relatively to the part of special systems (CCTV systems, access control systems), electrical systems (general lighting system, emergency exit evacuation and signaling systems, elevators, audio-visual systems, fire-fighting systems), mechanical systems (M/R air ducts, diffusers, plenums, fire dampers, winter and summer air conditioning), special waste disposal systems (aircraft fuel loading and unloading, oily liquid disposal, and wastewater).
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-others | 1 year | Set by the GDPR Cookie Consent plugin, this cookie stores user consent for cookies in the category "Others". |